Welcome to SBS The Biggest PEB factory in West Africa

Industrial Facility

Spanning an impressive 18,000 square meters, Project NG2-035 boasts the following features:

- Roof Slope: 1:10
- Eave Height: 8.00 meters
- Wall Construction: 4-meter block wall with 0.7 Aluzinc sheeting
- Insulation: Rockwool insulation with Steel HDG wire mesh

This project extends across 60 meters in width and 150 meters in length, playing a pivotal role in the development of the Lagos Free Zone.

Our Project history.

  • Title: PROJECT NG2-035
  • Category: Industrial
  • Status: Completed
  • Year: 2022
  • Area: 18,000 m²
  • Country: Nigeria
  • Location: Lagos Free Zone

No Images Found!

Innovating Solutions and Solving Challenges

Contact Us

© 2024 SBS. All Rights Reserved